Our work

Projects & Portfolio

A selection of BIM deliverables across disciplines — from LOD 200 coordination models to LOD 400 fabrication-ready framing packages.

50+
Projects Delivered
6
BIM Disciplines
LOD 100–500
Model Detail Range
USVI & PR
Primary Markets
St. Croix, USVI2024LOD 350

Oceanfront Mixed-Use Development

New Construction

Full architectural and structural BIM package for a 4-story mixed-use building with ground-floor retail and residential above. Federated coordination model delivered for permit and construction.

  • 48,000 SF mixed-use
  • Revit architectural + structural
  • Navisworks coordination
  • IFC export for owner review
ArchitecturalStructuralCoordination
St. Thomas, USVI2024LOD 400

Resort Villa Complex — Framing Package

New Construction

Light-gauge steel framing models for 12 resort villas, coordinated against architectural shell. Delivered panel shop drawings and CNC cutting lists directly to the fabricator.

  • 12 villa units
  • Light-gauge steel framing
  • Panel shop drawings
  • CNC cutting list output
FramingArchitectural
San Juan, Puerto Rico2023LOD 300

Hospital Wing MEP Coordination

Renovation

MEP routing and clash detection for a 3-floor hospital wing renovation. Coordinated mechanical, electrical, plumbing, and fire protection against existing structural and new architectural partitions.

  • 3-floor hospital wing
  • Full MEP routing in Revit
  • Zero hard clashes at construction start
  • BCF issue log — 214 clashes resolved
MEPClash DetectionCoordination
Christiansted, St. Croix2023LOD 300

Government Administration Building

New Construction

Architectural and structural BIM for a 2-story government administration building. Model used for permit submission, quantity takeoffs, and construction coordination.

  • 22,000 SF government facility
  • Concrete structural model
  • Permit-ready documentation
  • Quantity takeoff schedules
ArchitecturalStructural
Frederiksted, St. Croix2024LOD 300

Retail Strip Center — Clash Detection Audit

Renovation

Standalone clash detection engagement on a client-supplied federated model. Identified and categorized 87 hard clashes and 143 soft clashes across MEP and structural disciplines, with prioritized BCF report.

  • 87 hard clashes identified
  • 143 soft clashes catalogued
  • Prioritized BCF report
  • Re-run verification included
Clash Detection
Christiansted, St. Croix2025LOD 400

Waterfront Hotel — Full BIM Package

New Construction

End-to-end BIM services for a 6-story waterfront hotel — architectural, structural, light-gauge framing, full MEP, and multi-discipline coordination. Delivered clash-free federated model for construction.

  • 6-story, 96-room hotel
  • All disciplines in single federated model
  • Zero unresolved clashes at GMP
  • LOD 400 framing and MEP
ArchitecturalStructuralMEPFramingCoordinationClash Detection

Have a project in mind?

Share your drawings or RFP and we'll respond with a scope and timeline within 48 hours.